What We Do

100 Morey Drive
Woodridge, IL 60517
(630) 754-2300
info@moreycorp.com

Design for X

Our NPI, design engineering, manufacturing engineering, planning, program management and fulfillment teams are all located at the corporate office. This synergistic approach creates value throughout each phase of a program.
 

Design for Cost

Assumption: main cost drivers of new products are determined by some combination of labor {design and
assembly) and BOM.

  • Design for Procurement
  • Design for Assembly
  • Design for Leverage
  • Design for Supply Chain

 

Design for Marketability

  • Design for IP protection
  • Design for Ease-of-Use
  • Design for Mass Adoption
  • Design for Warranty
  • Design for Aesthetics (ergonomics, consumer appeal, etc.)
  • Design for Application Environment

 

Design for Quality

  • Design for Containment
  • Design for Testing
  • Design for Environment

 

Design for Delivery

  • Design for Packaging
  • Design for Proximity
  • Design for Field Serviceability

 

Design for Manufacturing

  • Design for Throughput
  • Design for Automation
  • Design for Assembly